{"id":308930,"date":"2023-10-01T07:00:09","date_gmt":"2023-10-01T11:00:09","guid":{"rendered":"https:\/\/dominicanewsonline.com\/news\/?p=308930"},"modified":"2023-10-01T13:02:03","modified_gmt":"2023-10-01T17:02:03","slug":"repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete","status":"publish","type":"post","link":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/","title":{"rendered":"Repair of DOMLEC&#8217;s damaged pipeline in Trafalgar 90 percent complete"},"content":{"rendered":"<figure id=\"attachment_308931\" aria-describedby=\"caption-attachment-308931\" style=\"width: 325px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-308931 \" src=\"https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/Damaged-pipeline-in-Trafalgar.png\" alt=\"\" width=\"325\" height=\"526\" srcset=\"https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/Damaged-pipeline-in-Trafalgar.png 243w, https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/Damaged-pipeline-in-Trafalgar-185x300.png 185w\" sizes=\"auto, (max-width: 325px) 100vw, 325px\" \/><figcaption id=\"caption-attachment-308931\" class=\"wp-caption-text\">Damaged pipeline in Trafalgar<\/figcaption><\/figure>\n<p>Chief Operations Officer at the island\u2019s sole electricity company Dominica Electricity Services (DOMLEC), Dave Stamp has announced that the company is 90 percent complete with repair of the damaged pipeline in Trafalgar. He made the announcement during DOMLEC&#8217;s progress update on Friday.<\/p>\n<p>The pipeline was damaged on September 22 causing a reduction in electricity generation capacity at Trafalgar and its PADU Station. This development came amidst the ongoing challenges faced by residents and businesses due to frequent power outages, often referred to as \u201cload shedding,\u201d which have plagued the island for several months. DOMLEC attributes these issues to inadequate power generation capacity, an ageing diesel generation fleet, and reliance on equipment that has served the company for 37 years.<\/p>\n<p>\u201cWe are over 90 percent complete with the repair of that pipeline as we hope to bring that pipeline back in service early in the coming week,\u201d Stamp revealed.<\/p>\n<p>He told customers that this pipeline, when the company has the maximum hydro capacity, accounts for over 5 megawatts of generating capacity.<\/p>\n<p>\u201cIt\u2019s a very valuable pipeline,\u201d he noted.<\/p>\n<p>According to Stamp, it is expected that with the reduced capacity, \u201cwe don\u2019t think we will be able to get the maximum out of that.\u201d<\/p>\n<p>He said the company may need an additional 1 to 2 megawatts when the pipeline is back in service.<\/p>\n<p>Furthermore, Stamp explained that ongoing works are being done in the river where a diversion is being created to facilitate the PADU Station.<\/p>\n<p>\u201cThe outlook for the community looks optimistic,\u201d he indicated. \u201cWe have seen some improvements in terms of our load management program and minimum and less interruptions and less load shedding.\u201d<\/p>\n<p>Meanwhile, Stamp said as far as the maintenance of the hydro pipelines is concerned part of the focus of the hydro team is to check the pipelines on a regular basis.<\/p>\n<p>\u201cOn a regular basis, at least once a year we have third-party consultants doing inspections on these pipelines\u2026,\u201d Stamp revealed.<\/p>\n<p>He mentioned further that DOMLEC is in the process of putting some of the recommendations in place.<\/p>\n<p>\u201cBut we need to understand that there are many miles of pipelines\u2026,\u201d he said.<\/p>\n<p>He continued, \u201cso there are times when there are areas that may have situations that we are not able to catch up on.\u201d<\/p>\n<p>Stamps added, \u201cIt just takes a rainfall or a flooding to cause an erosion in a particular spot and undermine the pipe support.\u201d<\/p>\n<p>He noted that the company\u2019s job now is to go in to examine the situation and implement measures to prevent a recurrence.<\/p>\n","protected":false},"excerpt":{"rendered":"Chief Operations Officer at the island\u2019s sole electricity company Dominica Electricity Services (DOMLEC), Dave Stamp has announced that the company is 90 percent complete with repair of the damaged pipeline in Trafalgar. He made the announcement during DOMLEC&#8217;s progress update&#8230;","protected":false},"author":13,"featured_media":308943,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_cbd_carousel_blocks":"[]","footnotes":""},"categories":[158,235,285,9,21],"tags":[],"class_list":["post-308930","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-disasters","category-homepage-carousel","category-infrastructure","category-news","category-technology"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Repair of DOMLEC&#039;s damaged pipeline in Trafalgar 90 percent complete - Dominica News Online<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Repair of DOMLEC&#039;s damaged pipeline in Trafalgar 90 percent complete - Dominica News Online\" \/>\n<meta property=\"og:description\" content=\"Chief Operations Officer at the island\u2019s sole electricity company Dominica Electricity Services (DOMLEC), Dave Stamp has announced that the company is 90 percent complete with repair of the damaged pipeline in Trafalgar. He made the announcement during DOMLEC&#8217;s progress update...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/\" \/>\n<meta property=\"og:site_name\" content=\"Dominica News Online\" \/>\n<meta property=\"article:author\" content=\"Malaika\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-01T11:00:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-01T17:02:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/DOMLEC-repair-almost-complete.png\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"208\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Admin\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/\"},\"author\":{\"name\":\"Admin\",\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/#\\\/schema\\\/person\\\/838be977f4b17551ad9c04956d985730\"},\"headline\":\"Repair of DOMLEC&#8217;s damaged pipeline in Trafalgar 90 percent complete\",\"datePublished\":\"2023-10-01T11:00:09+00:00\",\"dateModified\":\"2023-10-01T17:02:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/\"},\"wordCount\":443,\"commentCount\":6,\"image\":{\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/DOMLEC-repair-almost-complete.png\",\"articleSection\":[\"Disasters\",\"Homepage Carousel\",\"Infrastructure\",\"News\",\"Technology\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/\",\"url\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/\",\"name\":\"Repair of DOMLEC's damaged pipeline in Trafalgar 90 percent complete - Dominica News Online\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/DOMLEC-repair-almost-complete.png\",\"datePublished\":\"2023-10-01T11:00:09+00:00\",\"dateModified\":\"2023-10-01T17:02:03+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/#\\\/schema\\\/person\\\/838be977f4b17551ad9c04956d985730\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/DOMLEC-repair-almost-complete.png\",\"contentUrl\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/DOMLEC-repair-almost-complete.png\",\"width\":400,\"height\":208},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/homepage\\\/homepage-carousel\\\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Repair of DOMLEC&#8217;s damaged pipeline in Trafalgar 90 percent complete\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/\",\"name\":\"Dominica News Online\",\"description\":\"The most popular news site in the Commonwealth of Dominica\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/#\\\/schema\\\/person\\\/838be977f4b17551ad9c04956d985730\",\"name\":\"Admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b11ff91eab40baceecc540954738e081ab038af9a7180b8c43b4d0fbb743caa?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b11ff91eab40baceecc540954738e081ab038af9a7180b8c43b4d0fbb743caa?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b11ff91eab40baceecc540954738e081ab038af9a7180b8c43b4d0fbb743caa?s=96&d=mm&r=g\",\"caption\":\"Admin\"},\"sameAs\":[\"Malaika\"],\"url\":\"https:\\\/\\\/dominicanewsonline.com\\\/news\\\/author\\\/malaika\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Repair of DOMLEC's damaged pipeline in Trafalgar 90 percent complete - Dominica News Online","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/","og_locale":"en_US","og_type":"article","og_title":"Repair of DOMLEC's damaged pipeline in Trafalgar 90 percent complete - Dominica News Online","og_description":"Chief Operations Officer at the island\u2019s sole electricity company Dominica Electricity Services (DOMLEC), Dave Stamp has announced that the company is 90 percent complete with repair of the damaged pipeline in Trafalgar. He made the announcement during DOMLEC&#8217;s progress update...","og_url":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/","og_site_name":"Dominica News Online","article_author":"Malaika","article_published_time":"2023-10-01T11:00:09+00:00","article_modified_time":"2023-10-01T17:02:03+00:00","og_image":[{"width":400,"height":208,"url":"https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/DOMLEC-repair-almost-complete.png","type":"image\/png"}],"author":"Admin","twitter_misc":{"Written by":"Admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/#article","isPartOf":{"@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/"},"author":{"name":"Admin","@id":"https:\/\/dominicanewsonline.com\/news\/#\/schema\/person\/838be977f4b17551ad9c04956d985730"},"headline":"Repair of DOMLEC&#8217;s damaged pipeline in Trafalgar 90 percent complete","datePublished":"2023-10-01T11:00:09+00:00","dateModified":"2023-10-01T17:02:03+00:00","mainEntityOfPage":{"@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/"},"wordCount":443,"commentCount":6,"image":{"@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/#primaryimage"},"thumbnailUrl":"https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/DOMLEC-repair-almost-complete.png","articleSection":["Disasters","Homepage Carousel","Infrastructure","News","Technology"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/","url":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/","name":"Repair of DOMLEC's damaged pipeline in Trafalgar 90 percent complete - Dominica News Online","isPartOf":{"@id":"https:\/\/dominicanewsonline.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/#primaryimage"},"image":{"@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/#primaryimage"},"thumbnailUrl":"https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/DOMLEC-repair-almost-complete.png","datePublished":"2023-10-01T11:00:09+00:00","dateModified":"2023-10-01T17:02:03+00:00","author":{"@id":"https:\/\/dominicanewsonline.com\/news\/#\/schema\/person\/838be977f4b17551ad9c04956d985730"},"breadcrumb":{"@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/#primaryimage","url":"https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/DOMLEC-repair-almost-complete.png","contentUrl":"https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/DOMLEC-repair-almost-complete.png","width":400,"height":208},{"@type":"BreadcrumbList","@id":"https:\/\/dominicanewsonline.com\/news\/homepage\/homepage-carousel\/repair-of-domlecs-damaged-pipeline-in-trafalgar-90-percent-complete\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dominicanewsonline.com\/news\/"},{"@type":"ListItem","position":2,"name":"Repair of DOMLEC&#8217;s damaged pipeline in Trafalgar 90 percent complete"}]},{"@type":"WebSite","@id":"https:\/\/dominicanewsonline.com\/news\/#website","url":"https:\/\/dominicanewsonline.com\/news\/","name":"Dominica News Online","description":"The most popular news site in the Commonwealth of Dominica","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dominicanewsonline.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/dominicanewsonline.com\/news\/#\/schema\/person\/838be977f4b17551ad9c04956d985730","name":"Admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4b11ff91eab40baceecc540954738e081ab038af9a7180b8c43b4d0fbb743caa?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4b11ff91eab40baceecc540954738e081ab038af9a7180b8c43b4d0fbb743caa?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4b11ff91eab40baceecc540954738e081ab038af9a7180b8c43b4d0fbb743caa?s=96&d=mm&r=g","caption":"Admin"},"sameAs":["Malaika"],"url":"https:\/\/dominicanewsonline.com\/news\/author\/malaika\/"}]}},"jetpack_featured_media_url":"https:\/\/dominicanewsonline.com\/news\/wp-content\/uploads\/2023\/10\/DOMLEC-repair-almost-complete.png","_links":{"self":[{"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/posts\/308930","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/comments?post=308930"}],"version-history":[{"count":1,"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/posts\/308930\/revisions"}],"predecessor-version":[{"id":308932,"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/posts\/308930\/revisions\/308932"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/media\/308943"}],"wp:attachment":[{"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/media?parent=308930"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/categories?post=308930"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dominicanewsonline.com\/news\/wp-json\/wp\/v2\/tags?post=308930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}